Additional role at work highly stressful - keep for growth, or drop for not a good fit?












3














About 3 months ago, our teams restructured and I was offered the opportunity to be Scrum Master for the new team. The role pretty much meant 1) being in charge of scheduling the necessary ceremonies, 2) being default facilitator for the meetings, and 3) making sure the team upholds the promises they said they would do. There is no authority in the additional role. Wanting to improve my leadership skills, I took the role.
For some context, I have been in previous teams that have had a Scrum Master, so I saw what tasks they did, but I myself have not been one yet.



Since the 3 months of being Scrum Master, I have found the role to be a lot more stressful than I thought. I struggle a lot with the facilitating meeting aspect of it, and with making sure the team does what they say they do. I was given a Scrum Master book from my previous team lead, which gave practical tips and example scenarios, which I found very helpful, but it also shows the Scrum Masters being able to ask relevant and revealing questions on the spot, and impromptu speaking is not something I am good at. This also explains a bit why facilitation is difficult for me - you can't plan ahead what people will say, and you don't have time to decide what the useful questions for the team are.



On the other hand, I want to be able to facilitate groups, and develop my skills, and grow as a person. I realize this position is going outside of my comfort zone, but I am not sure if it is too much out of my comfort zone and leading to burnout.



I had a year-end review with my manager last week, and he noticed that I was stressed out and frustrated with the Scrum Master role. Other team members have picked up on this as well. He... suggested that if the extra role was too stressful for me, then maybe it would be better if someone else had the role, someone who has an easier time with doing the things I struggle with.



This brings me to the main question: Should I continue an extra role, if it is highly stressful for me, but it is an area I want to improve in?



Should I continue to get better, or stop because it isn't a good fit?










share|improve this question
























  • What age group you are in? Lot would depend on where you are in your career stage and personal/family stage right now. However, either ways answers may just be a career advice which is not encouraged in this forum.
    – PagMax
    23 hours ago








  • 2




    I'm in mid-20s, no children. I've been a developer for about 4 years now, so I would say I'm firmly in the medior level (between junior and senior).
    – plasmaTonic
    22 hours ago










  • After I posted this message, I went to the Workplace tour page, and noticed that "Personal advice on what to do" questions are discouraged here... if this question doesn't fit the format of this Exchange, I can delete it..
    – plasmaTonic
    22 hours ago






  • 1




    I think you raise valid issues, you just need to reformulate as maybe "How to deal with stress of SM position" or similar.
    – Arthur Havlicek
    22 hours ago










  • Your main title no longer agrees with the question itself. So what do you actually want to know here?
    – Joe Strazzere
    9 hours ago
















3














About 3 months ago, our teams restructured and I was offered the opportunity to be Scrum Master for the new team. The role pretty much meant 1) being in charge of scheduling the necessary ceremonies, 2) being default facilitator for the meetings, and 3) making sure the team upholds the promises they said they would do. There is no authority in the additional role. Wanting to improve my leadership skills, I took the role.
For some context, I have been in previous teams that have had a Scrum Master, so I saw what tasks they did, but I myself have not been one yet.



Since the 3 months of being Scrum Master, I have found the role to be a lot more stressful than I thought. I struggle a lot with the facilitating meeting aspect of it, and with making sure the team does what they say they do. I was given a Scrum Master book from my previous team lead, which gave practical tips and example scenarios, which I found very helpful, but it also shows the Scrum Masters being able to ask relevant and revealing questions on the spot, and impromptu speaking is not something I am good at. This also explains a bit why facilitation is difficult for me - you can't plan ahead what people will say, and you don't have time to decide what the useful questions for the team are.



On the other hand, I want to be able to facilitate groups, and develop my skills, and grow as a person. I realize this position is going outside of my comfort zone, but I am not sure if it is too much out of my comfort zone and leading to burnout.



I had a year-end review with my manager last week, and he noticed that I was stressed out and frustrated with the Scrum Master role. Other team members have picked up on this as well. He... suggested that if the extra role was too stressful for me, then maybe it would be better if someone else had the role, someone who has an easier time with doing the things I struggle with.



This brings me to the main question: Should I continue an extra role, if it is highly stressful for me, but it is an area I want to improve in?



Should I continue to get better, or stop because it isn't a good fit?










share|improve this question
























  • What age group you are in? Lot would depend on where you are in your career stage and personal/family stage right now. However, either ways answers may just be a career advice which is not encouraged in this forum.
    – PagMax
    23 hours ago








  • 2




    I'm in mid-20s, no children. I've been a developer for about 4 years now, so I would say I'm firmly in the medior level (between junior and senior).
    – plasmaTonic
    22 hours ago










  • After I posted this message, I went to the Workplace tour page, and noticed that "Personal advice on what to do" questions are discouraged here... if this question doesn't fit the format of this Exchange, I can delete it..
    – plasmaTonic
    22 hours ago






  • 1




    I think you raise valid issues, you just need to reformulate as maybe "How to deal with stress of SM position" or similar.
    – Arthur Havlicek
    22 hours ago










  • Your main title no longer agrees with the question itself. So what do you actually want to know here?
    – Joe Strazzere
    9 hours ago














3












3








3







About 3 months ago, our teams restructured and I was offered the opportunity to be Scrum Master for the new team. The role pretty much meant 1) being in charge of scheduling the necessary ceremonies, 2) being default facilitator for the meetings, and 3) making sure the team upholds the promises they said they would do. There is no authority in the additional role. Wanting to improve my leadership skills, I took the role.
For some context, I have been in previous teams that have had a Scrum Master, so I saw what tasks they did, but I myself have not been one yet.



Since the 3 months of being Scrum Master, I have found the role to be a lot more stressful than I thought. I struggle a lot with the facilitating meeting aspect of it, and with making sure the team does what they say they do. I was given a Scrum Master book from my previous team lead, which gave practical tips and example scenarios, which I found very helpful, but it also shows the Scrum Masters being able to ask relevant and revealing questions on the spot, and impromptu speaking is not something I am good at. This also explains a bit why facilitation is difficult for me - you can't plan ahead what people will say, and you don't have time to decide what the useful questions for the team are.



On the other hand, I want to be able to facilitate groups, and develop my skills, and grow as a person. I realize this position is going outside of my comfort zone, but I am not sure if it is too much out of my comfort zone and leading to burnout.



I had a year-end review with my manager last week, and he noticed that I was stressed out and frustrated with the Scrum Master role. Other team members have picked up on this as well. He... suggested that if the extra role was too stressful for me, then maybe it would be better if someone else had the role, someone who has an easier time with doing the things I struggle with.



This brings me to the main question: Should I continue an extra role, if it is highly stressful for me, but it is an area I want to improve in?



Should I continue to get better, or stop because it isn't a good fit?










share|improve this question















About 3 months ago, our teams restructured and I was offered the opportunity to be Scrum Master for the new team. The role pretty much meant 1) being in charge of scheduling the necessary ceremonies, 2) being default facilitator for the meetings, and 3) making sure the team upholds the promises they said they would do. There is no authority in the additional role. Wanting to improve my leadership skills, I took the role.
For some context, I have been in previous teams that have had a Scrum Master, so I saw what tasks they did, but I myself have not been one yet.



Since the 3 months of being Scrum Master, I have found the role to be a lot more stressful than I thought. I struggle a lot with the facilitating meeting aspect of it, and with making sure the team does what they say they do. I was given a Scrum Master book from my previous team lead, which gave practical tips and example scenarios, which I found very helpful, but it also shows the Scrum Masters being able to ask relevant and revealing questions on the spot, and impromptu speaking is not something I am good at. This also explains a bit why facilitation is difficult for me - you can't plan ahead what people will say, and you don't have time to decide what the useful questions for the team are.



On the other hand, I want to be able to facilitate groups, and develop my skills, and grow as a person. I realize this position is going outside of my comfort zone, but I am not sure if it is too much out of my comfort zone and leading to burnout.



I had a year-end review with my manager last week, and he noticed that I was stressed out and frustrated with the Scrum Master role. Other team members have picked up on this as well. He... suggested that if the extra role was too stressful for me, then maybe it would be better if someone else had the role, someone who has an easier time with doing the things I struggle with.



This brings me to the main question: Should I continue an extra role, if it is highly stressful for me, but it is an area I want to improve in?



Should I continue to get better, or stop because it isn't a good fit?







career-development careers skills stress






share|improve this question















share|improve this question













share|improve this question




share|improve this question








edited 2 mins ago

























asked 23 hours ago









plasmaTonic

606




606












  • What age group you are in? Lot would depend on where you are in your career stage and personal/family stage right now. However, either ways answers may just be a career advice which is not encouraged in this forum.
    – PagMax
    23 hours ago








  • 2




    I'm in mid-20s, no children. I've been a developer for about 4 years now, so I would say I'm firmly in the medior level (between junior and senior).
    – plasmaTonic
    22 hours ago










  • After I posted this message, I went to the Workplace tour page, and noticed that "Personal advice on what to do" questions are discouraged here... if this question doesn't fit the format of this Exchange, I can delete it..
    – plasmaTonic
    22 hours ago






  • 1




    I think you raise valid issues, you just need to reformulate as maybe "How to deal with stress of SM position" or similar.
    – Arthur Havlicek
    22 hours ago










  • Your main title no longer agrees with the question itself. So what do you actually want to know here?
    – Joe Strazzere
    9 hours ago


















  • What age group you are in? Lot would depend on where you are in your career stage and personal/family stage right now. However, either ways answers may just be a career advice which is not encouraged in this forum.
    – PagMax
    23 hours ago








  • 2




    I'm in mid-20s, no children. I've been a developer for about 4 years now, so I would say I'm firmly in the medior level (between junior and senior).
    – plasmaTonic
    22 hours ago










  • After I posted this message, I went to the Workplace tour page, and noticed that "Personal advice on what to do" questions are discouraged here... if this question doesn't fit the format of this Exchange, I can delete it..
    – plasmaTonic
    22 hours ago






  • 1




    I think you raise valid issues, you just need to reformulate as maybe "How to deal with stress of SM position" or similar.
    – Arthur Havlicek
    22 hours ago










  • Your main title no longer agrees with the question itself. So what do you actually want to know here?
    – Joe Strazzere
    9 hours ago
















What age group you are in? Lot would depend on where you are in your career stage and personal/family stage right now. However, either ways answers may just be a career advice which is not encouraged in this forum.
– PagMax
23 hours ago






What age group you are in? Lot would depend on where you are in your career stage and personal/family stage right now. However, either ways answers may just be a career advice which is not encouraged in this forum.
– PagMax
23 hours ago






2




2




I'm in mid-20s, no children. I've been a developer for about 4 years now, so I would say I'm firmly in the medior level (between junior and senior).
– plasmaTonic
22 hours ago




I'm in mid-20s, no children. I've been a developer for about 4 years now, so I would say I'm firmly in the medior level (between junior and senior).
– plasmaTonic
22 hours ago












After I posted this message, I went to the Workplace tour page, and noticed that "Personal advice on what to do" questions are discouraged here... if this question doesn't fit the format of this Exchange, I can delete it..
– plasmaTonic
22 hours ago




After I posted this message, I went to the Workplace tour page, and noticed that "Personal advice on what to do" questions are discouraged here... if this question doesn't fit the format of this Exchange, I can delete it..
– plasmaTonic
22 hours ago




1




1




I think you raise valid issues, you just need to reformulate as maybe "How to deal with stress of SM position" or similar.
– Arthur Havlicek
22 hours ago




I think you raise valid issues, you just need to reformulate as maybe "How to deal with stress of SM position" or similar.
– Arthur Havlicek
22 hours ago












Your main title no longer agrees with the question itself. So what do you actually want to know here?
– Joe Strazzere
9 hours ago




Your main title no longer agrees with the question itself. So what do you actually want to know here?
– Joe Strazzere
9 hours ago










4 Answers
4






active

oldest

votes


















18














You keep talking about "additional" and "extra". Being a Scrum Master is a job. It's not something you tack on top of your actual job. I mean you don't do the companies books in your lunch break or clean the floors after hours either. That's jobs, not additional duties to another job. No wonder you are stressed out.



Now, lets assume you actually had the time to properly do the Scrum Masters job and you would still be stressed out. Going out of one's comfort zone is great, but only to find out if you actually like what's out there. You never know if you don't try. You said you don't. It's not for you. And that's fine. There's no point in pushing. Go back to being a developer. If you want, try other things out of your comfort zone, maybe another language or another project or maybe even being PO or PM. But if you don't like being SM because it does not play into your strengths, don't do it. You don't seem to get more money, there is no "career path" from SM that you could not reach from developer either, so there is no gain.



I don't think you "grow as a person" by doing stuff that stresses you out for no gain and against better judgement. You grow bitter. But not better.



Life is too short to do stuff that stresses you out. Especially if it's not necessary. If you have the chance to be a happy developer, then what are you waiting for?






share|improve this answer





















  • I e been on a team where the role was passed between members, and while we made it work for a short while, having a dedicated scrum master is the only real way to have the role executed properly. That’s the direction we took and has only increased our team’s overall effectiveness.
    – Eric McCormick
    17 hours ago










  • It depends on the team size. Last place I worked the scrum master was about 40% scrum master, 60% developer, and they were switching to one person becoming scrum master for two teams as full time.
    – gnasher729
    17 hours ago










  • @gnasher729 That's the way it has been with the teams I worked on, too. But only after both team and SM had found their rhythm. I think that's too much for a new SM in a new team.
    – nvoigt
    15 hours ago



















5














I will not advise you what to do as career advice is not part of the site guidelines, but give you my opinion about the origin of stress : you try to endorse full responsibility at day one, while you have room to take the role in a lot more lean way and learn things as you practice them.




I struggle a lot with the facilitating meeting aspect of it




Great facilitators I've met let people speak at large and only stop them when they go offtopic. There is already a lot of value in letting everyone express his or her opinion, and not necessarily in giving yours or being relevant to the topic. Simply preparing a meeting purpose with a few words intro, letting everyone talk, is most if not all the job.




and with making sure the team does what they say they do.




In litterature I've read it's not really the SM job, but if it is your role anyway, the hardest part is trust. Trust people do what they say they do works most of the time. Some of the time only you are reported or will witness irregularities you have to investigate, but you don't have to be in everyone's back checking they are actually working. People usually try their best without you to tell them to do so.






share|improve this answer























  • In terms of making sure the team does what they say they do, say we have a retro and one of the action items is "we should do X when Y happens", and then Y happens, and I see we don't do X - isn't it the role of the SM to ask the team "I thought we said we would do X" ?
    – plasmaTonic
    21 hours ago






  • 1




    When the team says "we should do X when Y happens", you (and everyone, in fact) should ask himself who's responsibility it is to ensure X happens. If the point is not raised in the meeting maybe you as a scrum master should make sure it is, yes. AFAIK in no way you are a default holder for all responsibilities
    – Arthur Havlicek
    21 hours ago








  • 1




    @plasmaTonic You shouldn't say "I thought we said we would do X" You should say, "well an agreement waas made to do X, but then X didn't happen. It impacted the team in A, B, and C ways. What do you think we could have done to avoid those impacts?" and then let the team learn (the consequences of changing plans, better techniques for dealing with change, or the cost of changing plans). You're micro-managing, when you do the thinking for them, and you lack the power to do it effectively, despite taking that role on yourself, hence the stress. You don't enforce other's promises.
    – Edwin Buck
    20 hours ago












  • @EdwinBuck You bring up a good point - also that some of my stress is that I'm not sure how best to do the role of Scrum Master (my "training" was seeing how other people do it and reading about people saying the right things for the given scenario). But I still need to learn what are the effective things to say, and the correct phrasing.
    – plasmaTonic
    19 hours ago



















2














There are plenty of ways to grow leadership skills, but getting stressed over the ceremonial parts of a SM role will prevent you from focusing on this, and seeing you struggling will not instil confidence in your abilities as a leader. To the contrary, if you maintain an situation that others express doubt in, it can be seen as a lack of judgement.



That said, there's plenty of takeaway from the situation; As SM, you've likely tracked tasks for all members of a team, so you know by now how work tends to get done. E.g. when someone is being overambitious in estimation, which tasks normally takes an extra review to get right, how soon business can expect a feature to be delivered, when it's time to clean up tech debt to maintain progress. That's hugely valuable.



The good news is you don't have to be a SM to make use of this knowledge. In planning, the approach most often agreed upon is the one that most closely aligns with 'how things normally get done', and having focused on overall team performance, you'll be in a better position than most to assess this.



Before deciding to keep the role or not, I'd air my concerns to the rest of the team. Maybe a compromise can be found with less ceremony and shared facilitation duty. Maybe the parts that you stress about are insignificant to others, and you'll know to focus less on them. Maybe others will come to understand the burden of being a SM and thus appreciate your efforts more.






share|improve this answer










New contributor




corolla is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.


























    1














    As a professional agile coach (and someone who has been in the agile space since 2003) I can see where your issues lie:




    The role pretty much means being in charge of scheduling the necessary ceremonies,




    Nope, the team/PO own the ceremonies so are responsible for scheduling them




    being default facilitator for the meetings,




    Nope, you can facilitate to help, but they should be able to function without you.




    and making sure the team upholds the promises they said they would do




    Nope, the team makes a forecast of what they will do (commitment was deprecated in 2011 as it's fixed scope in fixed time)



    You are in a very common Scrum antipattern - Scrum Mom ( see here - https://age-of-product.com/scrum-mom/)



    As a Scrum Master your role is:




    • Help the team clear blockers

    • Coach the team on the agreed process.


    You have no responsibilities over whether the team deliver, you are there to help work flow, it's a people job, not involving project management or administration.



    Your stress is because you are being asked to do things that are deliberately NOT in the Scrum Master remit.






    share|improve this answer























      Your Answer








      StackExchange.ready(function() {
      var channelOptions = {
      tags: "".split(" "),
      id: "423"
      };
      initTagRenderer("".split(" "), "".split(" "), channelOptions);

      StackExchange.using("externalEditor", function() {
      // Have to fire editor after snippets, if snippets enabled
      if (StackExchange.settings.snippets.snippetsEnabled) {
      StackExchange.using("snippets", function() {
      createEditor();
      });
      }
      else {
      createEditor();
      }
      });

      function createEditor() {
      StackExchange.prepareEditor({
      heartbeatType: 'answer',
      autoActivateHeartbeat: false,
      convertImagesToLinks: false,
      noModals: true,
      showLowRepImageUploadWarning: true,
      reputationToPostImages: null,
      bindNavPrevention: true,
      postfix: "",
      imageUploader: {
      brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
      contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/3.0/"u003ecc by-sa 3.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
      allowUrls: true
      },
      noCode: true, onDemand: false,
      discardSelector: ".discard-answer"
      ,immediatelyShowMarkdownHelp:true
      });


      }
      });














      draft saved

      draft discarded


















      StackExchange.ready(
      function () {
      StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fworkplace.stackexchange.com%2fquestions%2f125575%2fadditional-role-at-work-highly-stressful-keep-for-growth-or-drop-for-not-a-go%23new-answer', 'question_page');
      }
      );

      Post as a guest















      Required, but never shown




















      StackExchange.ready(function () {
      $("#show-editor-button input, #show-editor-button button").click(function () {
      var showEditor = function() {
      $("#show-editor-button").hide();
      $("#post-form").removeClass("dno");
      StackExchange.editor.finallyInit();
      };

      var useFancy = $(this).data('confirm-use-fancy');
      if(useFancy == 'True') {
      var popupTitle = $(this).data('confirm-fancy-title');
      var popupBody = $(this).data('confirm-fancy-body');
      var popupAccept = $(this).data('confirm-fancy-accept-button');

      $(this).loadPopup({
      url: '/post/self-answer-popup',
      loaded: function(popup) {
      var pTitle = $(popup).find('h2');
      var pBody = $(popup).find('.popup-body');
      var pSubmit = $(popup).find('.popup-submit');

      pTitle.text(popupTitle);
      pBody.html(popupBody);
      pSubmit.val(popupAccept).click(showEditor);
      }
      })
      } else{
      var confirmText = $(this).data('confirm-text');
      if (confirmText ? confirm(confirmText) : true) {
      showEditor();
      }
      }
      });
      });






      4 Answers
      4






      active

      oldest

      votes








      4 Answers
      4






      active

      oldest

      votes









      active

      oldest

      votes






      active

      oldest

      votes









      18














      You keep talking about "additional" and "extra". Being a Scrum Master is a job. It's not something you tack on top of your actual job. I mean you don't do the companies books in your lunch break or clean the floors after hours either. That's jobs, not additional duties to another job. No wonder you are stressed out.



      Now, lets assume you actually had the time to properly do the Scrum Masters job and you would still be stressed out. Going out of one's comfort zone is great, but only to find out if you actually like what's out there. You never know if you don't try. You said you don't. It's not for you. And that's fine. There's no point in pushing. Go back to being a developer. If you want, try other things out of your comfort zone, maybe another language or another project or maybe even being PO or PM. But if you don't like being SM because it does not play into your strengths, don't do it. You don't seem to get more money, there is no "career path" from SM that you could not reach from developer either, so there is no gain.



      I don't think you "grow as a person" by doing stuff that stresses you out for no gain and against better judgement. You grow bitter. But not better.



      Life is too short to do stuff that stresses you out. Especially if it's not necessary. If you have the chance to be a happy developer, then what are you waiting for?






      share|improve this answer





















      • I e been on a team where the role was passed between members, and while we made it work for a short while, having a dedicated scrum master is the only real way to have the role executed properly. That’s the direction we took and has only increased our team’s overall effectiveness.
        – Eric McCormick
        17 hours ago










      • It depends on the team size. Last place I worked the scrum master was about 40% scrum master, 60% developer, and they were switching to one person becoming scrum master for two teams as full time.
        – gnasher729
        17 hours ago










      • @gnasher729 That's the way it has been with the teams I worked on, too. But only after both team and SM had found their rhythm. I think that's too much for a new SM in a new team.
        – nvoigt
        15 hours ago
















      18














      You keep talking about "additional" and "extra". Being a Scrum Master is a job. It's not something you tack on top of your actual job. I mean you don't do the companies books in your lunch break or clean the floors after hours either. That's jobs, not additional duties to another job. No wonder you are stressed out.



      Now, lets assume you actually had the time to properly do the Scrum Masters job and you would still be stressed out. Going out of one's comfort zone is great, but only to find out if you actually like what's out there. You never know if you don't try. You said you don't. It's not for you. And that's fine. There's no point in pushing. Go back to being a developer. If you want, try other things out of your comfort zone, maybe another language or another project or maybe even being PO or PM. But if you don't like being SM because it does not play into your strengths, don't do it. You don't seem to get more money, there is no "career path" from SM that you could not reach from developer either, so there is no gain.



      I don't think you "grow as a person" by doing stuff that stresses you out for no gain and against better judgement. You grow bitter. But not better.



      Life is too short to do stuff that stresses you out. Especially if it's not necessary. If you have the chance to be a happy developer, then what are you waiting for?






      share|improve this answer





















      • I e been on a team where the role was passed between members, and while we made it work for a short while, having a dedicated scrum master is the only real way to have the role executed properly. That’s the direction we took and has only increased our team’s overall effectiveness.
        – Eric McCormick
        17 hours ago










      • It depends on the team size. Last place I worked the scrum master was about 40% scrum master, 60% developer, and they were switching to one person becoming scrum master for two teams as full time.
        – gnasher729
        17 hours ago










      • @gnasher729 That's the way it has been with the teams I worked on, too. But only after both team and SM had found their rhythm. I think that's too much for a new SM in a new team.
        – nvoigt
        15 hours ago














      18












      18








      18






      You keep talking about "additional" and "extra". Being a Scrum Master is a job. It's not something you tack on top of your actual job. I mean you don't do the companies books in your lunch break or clean the floors after hours either. That's jobs, not additional duties to another job. No wonder you are stressed out.



      Now, lets assume you actually had the time to properly do the Scrum Masters job and you would still be stressed out. Going out of one's comfort zone is great, but only to find out if you actually like what's out there. You never know if you don't try. You said you don't. It's not for you. And that's fine. There's no point in pushing. Go back to being a developer. If you want, try other things out of your comfort zone, maybe another language or another project or maybe even being PO or PM. But if you don't like being SM because it does not play into your strengths, don't do it. You don't seem to get more money, there is no "career path" from SM that you could not reach from developer either, so there is no gain.



      I don't think you "grow as a person" by doing stuff that stresses you out for no gain and against better judgement. You grow bitter. But not better.



      Life is too short to do stuff that stresses you out. Especially if it's not necessary. If you have the chance to be a happy developer, then what are you waiting for?






      share|improve this answer












      You keep talking about "additional" and "extra". Being a Scrum Master is a job. It's not something you tack on top of your actual job. I mean you don't do the companies books in your lunch break or clean the floors after hours either. That's jobs, not additional duties to another job. No wonder you are stressed out.



      Now, lets assume you actually had the time to properly do the Scrum Masters job and you would still be stressed out. Going out of one's comfort zone is great, but only to find out if you actually like what's out there. You never know if you don't try. You said you don't. It's not for you. And that's fine. There's no point in pushing. Go back to being a developer. If you want, try other things out of your comfort zone, maybe another language or another project or maybe even being PO or PM. But if you don't like being SM because it does not play into your strengths, don't do it. You don't seem to get more money, there is no "career path" from SM that you could not reach from developer either, so there is no gain.



      I don't think you "grow as a person" by doing stuff that stresses you out for no gain and against better judgement. You grow bitter. But not better.



      Life is too short to do stuff that stresses you out. Especially if it's not necessary. If you have the chance to be a happy developer, then what are you waiting for?







      share|improve this answer












      share|improve this answer



      share|improve this answer










      answered 22 hours ago









      nvoigt

      46.8k20112158




      46.8k20112158












      • I e been on a team where the role was passed between members, and while we made it work for a short while, having a dedicated scrum master is the only real way to have the role executed properly. That’s the direction we took and has only increased our team’s overall effectiveness.
        – Eric McCormick
        17 hours ago










      • It depends on the team size. Last place I worked the scrum master was about 40% scrum master, 60% developer, and they were switching to one person becoming scrum master for two teams as full time.
        – gnasher729
        17 hours ago










      • @gnasher729 That's the way it has been with the teams I worked on, too. But only after both team and SM had found their rhythm. I think that's too much for a new SM in a new team.
        – nvoigt
        15 hours ago


















      • I e been on a team where the role was passed between members, and while we made it work for a short while, having a dedicated scrum master is the only real way to have the role executed properly. That’s the direction we took and has only increased our team’s overall effectiveness.
        – Eric McCormick
        17 hours ago










      • It depends on the team size. Last place I worked the scrum master was about 40% scrum master, 60% developer, and they were switching to one person becoming scrum master for two teams as full time.
        – gnasher729
        17 hours ago










      • @gnasher729 That's the way it has been with the teams I worked on, too. But only after both team and SM had found their rhythm. I think that's too much for a new SM in a new team.
        – nvoigt
        15 hours ago
















      I e been on a team where the role was passed between members, and while we made it work for a short while, having a dedicated scrum master is the only real way to have the role executed properly. That’s the direction we took and has only increased our team’s overall effectiveness.
      – Eric McCormick
      17 hours ago




      I e been on a team where the role was passed between members, and while we made it work for a short while, having a dedicated scrum master is the only real way to have the role executed properly. That’s the direction we took and has only increased our team’s overall effectiveness.
      – Eric McCormick
      17 hours ago












      It depends on the team size. Last place I worked the scrum master was about 40% scrum master, 60% developer, and they were switching to one person becoming scrum master for two teams as full time.
      – gnasher729
      17 hours ago




      It depends on the team size. Last place I worked the scrum master was about 40% scrum master, 60% developer, and they were switching to one person becoming scrum master for two teams as full time.
      – gnasher729
      17 hours ago












      @gnasher729 That's the way it has been with the teams I worked on, too. But only after both team and SM had found their rhythm. I think that's too much for a new SM in a new team.
      – nvoigt
      15 hours ago




      @gnasher729 That's the way it has been with the teams I worked on, too. But only after both team and SM had found their rhythm. I think that's too much for a new SM in a new team.
      – nvoigt
      15 hours ago













      5














      I will not advise you what to do as career advice is not part of the site guidelines, but give you my opinion about the origin of stress : you try to endorse full responsibility at day one, while you have room to take the role in a lot more lean way and learn things as you practice them.




      I struggle a lot with the facilitating meeting aspect of it




      Great facilitators I've met let people speak at large and only stop them when they go offtopic. There is already a lot of value in letting everyone express his or her opinion, and not necessarily in giving yours or being relevant to the topic. Simply preparing a meeting purpose with a few words intro, letting everyone talk, is most if not all the job.




      and with making sure the team does what they say they do.




      In litterature I've read it's not really the SM job, but if it is your role anyway, the hardest part is trust. Trust people do what they say they do works most of the time. Some of the time only you are reported or will witness irregularities you have to investigate, but you don't have to be in everyone's back checking they are actually working. People usually try their best without you to tell them to do so.






      share|improve this answer























      • In terms of making sure the team does what they say they do, say we have a retro and one of the action items is "we should do X when Y happens", and then Y happens, and I see we don't do X - isn't it the role of the SM to ask the team "I thought we said we would do X" ?
        – plasmaTonic
        21 hours ago






      • 1




        When the team says "we should do X when Y happens", you (and everyone, in fact) should ask himself who's responsibility it is to ensure X happens. If the point is not raised in the meeting maybe you as a scrum master should make sure it is, yes. AFAIK in no way you are a default holder for all responsibilities
        – Arthur Havlicek
        21 hours ago








      • 1




        @plasmaTonic You shouldn't say "I thought we said we would do X" You should say, "well an agreement waas made to do X, but then X didn't happen. It impacted the team in A, B, and C ways. What do you think we could have done to avoid those impacts?" and then let the team learn (the consequences of changing plans, better techniques for dealing with change, or the cost of changing plans). You're micro-managing, when you do the thinking for them, and you lack the power to do it effectively, despite taking that role on yourself, hence the stress. You don't enforce other's promises.
        – Edwin Buck
        20 hours ago












      • @EdwinBuck You bring up a good point - also that some of my stress is that I'm not sure how best to do the role of Scrum Master (my "training" was seeing how other people do it and reading about people saying the right things for the given scenario). But I still need to learn what are the effective things to say, and the correct phrasing.
        – plasmaTonic
        19 hours ago
















      5














      I will not advise you what to do as career advice is not part of the site guidelines, but give you my opinion about the origin of stress : you try to endorse full responsibility at day one, while you have room to take the role in a lot more lean way and learn things as you practice them.




      I struggle a lot with the facilitating meeting aspect of it




      Great facilitators I've met let people speak at large and only stop them when they go offtopic. There is already a lot of value in letting everyone express his or her opinion, and not necessarily in giving yours or being relevant to the topic. Simply preparing a meeting purpose with a few words intro, letting everyone talk, is most if not all the job.




      and with making sure the team does what they say they do.




      In litterature I've read it's not really the SM job, but if it is your role anyway, the hardest part is trust. Trust people do what they say they do works most of the time. Some of the time only you are reported or will witness irregularities you have to investigate, but you don't have to be in everyone's back checking they are actually working. People usually try their best without you to tell them to do so.






      share|improve this answer























      • In terms of making sure the team does what they say they do, say we have a retro and one of the action items is "we should do X when Y happens", and then Y happens, and I see we don't do X - isn't it the role of the SM to ask the team "I thought we said we would do X" ?
        – plasmaTonic
        21 hours ago






      • 1




        When the team says "we should do X when Y happens", you (and everyone, in fact) should ask himself who's responsibility it is to ensure X happens. If the point is not raised in the meeting maybe you as a scrum master should make sure it is, yes. AFAIK in no way you are a default holder for all responsibilities
        – Arthur Havlicek
        21 hours ago








      • 1




        @plasmaTonic You shouldn't say "I thought we said we would do X" You should say, "well an agreement waas made to do X, but then X didn't happen. It impacted the team in A, B, and C ways. What do you think we could have done to avoid those impacts?" and then let the team learn (the consequences of changing plans, better techniques for dealing with change, or the cost of changing plans). You're micro-managing, when you do the thinking for them, and you lack the power to do it effectively, despite taking that role on yourself, hence the stress. You don't enforce other's promises.
        – Edwin Buck
        20 hours ago












      • @EdwinBuck You bring up a good point - also that some of my stress is that I'm not sure how best to do the role of Scrum Master (my "training" was seeing how other people do it and reading about people saying the right things for the given scenario). But I still need to learn what are the effective things to say, and the correct phrasing.
        – plasmaTonic
        19 hours ago














      5












      5








      5






      I will not advise you what to do as career advice is not part of the site guidelines, but give you my opinion about the origin of stress : you try to endorse full responsibility at day one, while you have room to take the role in a lot more lean way and learn things as you practice them.




      I struggle a lot with the facilitating meeting aspect of it




      Great facilitators I've met let people speak at large and only stop them when they go offtopic. There is already a lot of value in letting everyone express his or her opinion, and not necessarily in giving yours or being relevant to the topic. Simply preparing a meeting purpose with a few words intro, letting everyone talk, is most if not all the job.




      and with making sure the team does what they say they do.




      In litterature I've read it's not really the SM job, but if it is your role anyway, the hardest part is trust. Trust people do what they say they do works most of the time. Some of the time only you are reported or will witness irregularities you have to investigate, but you don't have to be in everyone's back checking they are actually working. People usually try their best without you to tell them to do so.






      share|improve this answer














      I will not advise you what to do as career advice is not part of the site guidelines, but give you my opinion about the origin of stress : you try to endorse full responsibility at day one, while you have room to take the role in a lot more lean way and learn things as you practice them.




      I struggle a lot with the facilitating meeting aspect of it




      Great facilitators I've met let people speak at large and only stop them when they go offtopic. There is already a lot of value in letting everyone express his or her opinion, and not necessarily in giving yours or being relevant to the topic. Simply preparing a meeting purpose with a few words intro, letting everyone talk, is most if not all the job.




      and with making sure the team does what they say they do.




      In litterature I've read it's not really the SM job, but if it is your role anyway, the hardest part is trust. Trust people do what they say they do works most of the time. Some of the time only you are reported or will witness irregularities you have to investigate, but you don't have to be in everyone's back checking they are actually working. People usually try their best without you to tell them to do so.







      share|improve this answer














      share|improve this answer



      share|improve this answer








      edited 22 hours ago

























      answered 22 hours ago









      Arthur Havlicek

      2,5541415




      2,5541415












      • In terms of making sure the team does what they say they do, say we have a retro and one of the action items is "we should do X when Y happens", and then Y happens, and I see we don't do X - isn't it the role of the SM to ask the team "I thought we said we would do X" ?
        – plasmaTonic
        21 hours ago






      • 1




        When the team says "we should do X when Y happens", you (and everyone, in fact) should ask himself who's responsibility it is to ensure X happens. If the point is not raised in the meeting maybe you as a scrum master should make sure it is, yes. AFAIK in no way you are a default holder for all responsibilities
        – Arthur Havlicek
        21 hours ago








      • 1




        @plasmaTonic You shouldn't say "I thought we said we would do X" You should say, "well an agreement waas made to do X, but then X didn't happen. It impacted the team in A, B, and C ways. What do you think we could have done to avoid those impacts?" and then let the team learn (the consequences of changing plans, better techniques for dealing with change, or the cost of changing plans). You're micro-managing, when you do the thinking for them, and you lack the power to do it effectively, despite taking that role on yourself, hence the stress. You don't enforce other's promises.
        – Edwin Buck
        20 hours ago












      • @EdwinBuck You bring up a good point - also that some of my stress is that I'm not sure how best to do the role of Scrum Master (my "training" was seeing how other people do it and reading about people saying the right things for the given scenario). But I still need to learn what are the effective things to say, and the correct phrasing.
        – plasmaTonic
        19 hours ago


















      • In terms of making sure the team does what they say they do, say we have a retro and one of the action items is "we should do X when Y happens", and then Y happens, and I see we don't do X - isn't it the role of the SM to ask the team "I thought we said we would do X" ?
        – plasmaTonic
        21 hours ago






      • 1




        When the team says "we should do X when Y happens", you (and everyone, in fact) should ask himself who's responsibility it is to ensure X happens. If the point is not raised in the meeting maybe you as a scrum master should make sure it is, yes. AFAIK in no way you are a default holder for all responsibilities
        – Arthur Havlicek
        21 hours ago








      • 1




        @plasmaTonic You shouldn't say "I thought we said we would do X" You should say, "well an agreement waas made to do X, but then X didn't happen. It impacted the team in A, B, and C ways. What do you think we could have done to avoid those impacts?" and then let the team learn (the consequences of changing plans, better techniques for dealing with change, or the cost of changing plans). You're micro-managing, when you do the thinking for them, and you lack the power to do it effectively, despite taking that role on yourself, hence the stress. You don't enforce other's promises.
        – Edwin Buck
        20 hours ago












      • @EdwinBuck You bring up a good point - also that some of my stress is that I'm not sure how best to do the role of Scrum Master (my "training" was seeing how other people do it and reading about people saying the right things for the given scenario). But I still need to learn what are the effective things to say, and the correct phrasing.
        – plasmaTonic
        19 hours ago
















      In terms of making sure the team does what they say they do, say we have a retro and one of the action items is "we should do X when Y happens", and then Y happens, and I see we don't do X - isn't it the role of the SM to ask the team "I thought we said we would do X" ?
      – plasmaTonic
      21 hours ago




      In terms of making sure the team does what they say they do, say we have a retro and one of the action items is "we should do X when Y happens", and then Y happens, and I see we don't do X - isn't it the role of the SM to ask the team "I thought we said we would do X" ?
      – plasmaTonic
      21 hours ago




      1




      1




      When the team says "we should do X when Y happens", you (and everyone, in fact) should ask himself who's responsibility it is to ensure X happens. If the point is not raised in the meeting maybe you as a scrum master should make sure it is, yes. AFAIK in no way you are a default holder for all responsibilities
      – Arthur Havlicek
      21 hours ago






      When the team says "we should do X when Y happens", you (and everyone, in fact) should ask himself who's responsibility it is to ensure X happens. If the point is not raised in the meeting maybe you as a scrum master should make sure it is, yes. AFAIK in no way you are a default holder for all responsibilities
      – Arthur Havlicek
      21 hours ago






      1




      1




      @plasmaTonic You shouldn't say "I thought we said we would do X" You should say, "well an agreement waas made to do X, but then X didn't happen. It impacted the team in A, B, and C ways. What do you think we could have done to avoid those impacts?" and then let the team learn (the consequences of changing plans, better techniques for dealing with change, or the cost of changing plans). You're micro-managing, when you do the thinking for them, and you lack the power to do it effectively, despite taking that role on yourself, hence the stress. You don't enforce other's promises.
      – Edwin Buck
      20 hours ago






      @plasmaTonic You shouldn't say "I thought we said we would do X" You should say, "well an agreement waas made to do X, but then X didn't happen. It impacted the team in A, B, and C ways. What do you think we could have done to avoid those impacts?" and then let the team learn (the consequences of changing plans, better techniques for dealing with change, or the cost of changing plans). You're micro-managing, when you do the thinking for them, and you lack the power to do it effectively, despite taking that role on yourself, hence the stress. You don't enforce other's promises.
      – Edwin Buck
      20 hours ago














      @EdwinBuck You bring up a good point - also that some of my stress is that I'm not sure how best to do the role of Scrum Master (my "training" was seeing how other people do it and reading about people saying the right things for the given scenario). But I still need to learn what are the effective things to say, and the correct phrasing.
      – plasmaTonic
      19 hours ago




      @EdwinBuck You bring up a good point - also that some of my stress is that I'm not sure how best to do the role of Scrum Master (my "training" was seeing how other people do it and reading about people saying the right things for the given scenario). But I still need to learn what are the effective things to say, and the correct phrasing.
      – plasmaTonic
      19 hours ago











      2














      There are plenty of ways to grow leadership skills, but getting stressed over the ceremonial parts of a SM role will prevent you from focusing on this, and seeing you struggling will not instil confidence in your abilities as a leader. To the contrary, if you maintain an situation that others express doubt in, it can be seen as a lack of judgement.



      That said, there's plenty of takeaway from the situation; As SM, you've likely tracked tasks for all members of a team, so you know by now how work tends to get done. E.g. when someone is being overambitious in estimation, which tasks normally takes an extra review to get right, how soon business can expect a feature to be delivered, when it's time to clean up tech debt to maintain progress. That's hugely valuable.



      The good news is you don't have to be a SM to make use of this knowledge. In planning, the approach most often agreed upon is the one that most closely aligns with 'how things normally get done', and having focused on overall team performance, you'll be in a better position than most to assess this.



      Before deciding to keep the role or not, I'd air my concerns to the rest of the team. Maybe a compromise can be found with less ceremony and shared facilitation duty. Maybe the parts that you stress about are insignificant to others, and you'll know to focus less on them. Maybe others will come to understand the burden of being a SM and thus appreciate your efforts more.






      share|improve this answer










      New contributor




      corolla is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.























        2














        There are plenty of ways to grow leadership skills, but getting stressed over the ceremonial parts of a SM role will prevent you from focusing on this, and seeing you struggling will not instil confidence in your abilities as a leader. To the contrary, if you maintain an situation that others express doubt in, it can be seen as a lack of judgement.



        That said, there's plenty of takeaway from the situation; As SM, you've likely tracked tasks for all members of a team, so you know by now how work tends to get done. E.g. when someone is being overambitious in estimation, which tasks normally takes an extra review to get right, how soon business can expect a feature to be delivered, when it's time to clean up tech debt to maintain progress. That's hugely valuable.



        The good news is you don't have to be a SM to make use of this knowledge. In planning, the approach most often agreed upon is the one that most closely aligns with 'how things normally get done', and having focused on overall team performance, you'll be in a better position than most to assess this.



        Before deciding to keep the role or not, I'd air my concerns to the rest of the team. Maybe a compromise can be found with less ceremony and shared facilitation duty. Maybe the parts that you stress about are insignificant to others, and you'll know to focus less on them. Maybe others will come to understand the burden of being a SM and thus appreciate your efforts more.






        share|improve this answer










        New contributor




        corolla is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
        Check out our Code of Conduct.





















          2












          2








          2






          There are plenty of ways to grow leadership skills, but getting stressed over the ceremonial parts of a SM role will prevent you from focusing on this, and seeing you struggling will not instil confidence in your abilities as a leader. To the contrary, if you maintain an situation that others express doubt in, it can be seen as a lack of judgement.



          That said, there's plenty of takeaway from the situation; As SM, you've likely tracked tasks for all members of a team, so you know by now how work tends to get done. E.g. when someone is being overambitious in estimation, which tasks normally takes an extra review to get right, how soon business can expect a feature to be delivered, when it's time to clean up tech debt to maintain progress. That's hugely valuable.



          The good news is you don't have to be a SM to make use of this knowledge. In planning, the approach most often agreed upon is the one that most closely aligns with 'how things normally get done', and having focused on overall team performance, you'll be in a better position than most to assess this.



          Before deciding to keep the role or not, I'd air my concerns to the rest of the team. Maybe a compromise can be found with less ceremony and shared facilitation duty. Maybe the parts that you stress about are insignificant to others, and you'll know to focus less on them. Maybe others will come to understand the burden of being a SM and thus appreciate your efforts more.






          share|improve this answer










          New contributor




          corolla is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
          Check out our Code of Conduct.









          There are plenty of ways to grow leadership skills, but getting stressed over the ceremonial parts of a SM role will prevent you from focusing on this, and seeing you struggling will not instil confidence in your abilities as a leader. To the contrary, if you maintain an situation that others express doubt in, it can be seen as a lack of judgement.



          That said, there's plenty of takeaway from the situation; As SM, you've likely tracked tasks for all members of a team, so you know by now how work tends to get done. E.g. when someone is being overambitious in estimation, which tasks normally takes an extra review to get right, how soon business can expect a feature to be delivered, when it's time to clean up tech debt to maintain progress. That's hugely valuable.



          The good news is you don't have to be a SM to make use of this knowledge. In planning, the approach most often agreed upon is the one that most closely aligns with 'how things normally get done', and having focused on overall team performance, you'll be in a better position than most to assess this.



          Before deciding to keep the role or not, I'd air my concerns to the rest of the team. Maybe a compromise can be found with less ceremony and shared facilitation duty. Maybe the parts that you stress about are insignificant to others, and you'll know to focus less on them. Maybe others will come to understand the burden of being a SM and thus appreciate your efforts more.







          share|improve this answer










          New contributor




          corolla is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
          Check out our Code of Conduct.









          share|improve this answer



          share|improve this answer








          edited 22 hours ago





















          New contributor




          corolla is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
          Check out our Code of Conduct.









          answered 22 hours ago









          corolla

          72115




          72115




          New contributor




          corolla is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
          Check out our Code of Conduct.





          New contributor





          corolla is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
          Check out our Code of Conduct.






          corolla is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
          Check out our Code of Conduct.























              1














              As a professional agile coach (and someone who has been in the agile space since 2003) I can see where your issues lie:




              The role pretty much means being in charge of scheduling the necessary ceremonies,




              Nope, the team/PO own the ceremonies so are responsible for scheduling them




              being default facilitator for the meetings,




              Nope, you can facilitate to help, but they should be able to function without you.




              and making sure the team upholds the promises they said they would do




              Nope, the team makes a forecast of what they will do (commitment was deprecated in 2011 as it's fixed scope in fixed time)



              You are in a very common Scrum antipattern - Scrum Mom ( see here - https://age-of-product.com/scrum-mom/)



              As a Scrum Master your role is:




              • Help the team clear blockers

              • Coach the team on the agreed process.


              You have no responsibilities over whether the team deliver, you are there to help work flow, it's a people job, not involving project management or administration.



              Your stress is because you are being asked to do things that are deliberately NOT in the Scrum Master remit.






              share|improve this answer




























                1














                As a professional agile coach (and someone who has been in the agile space since 2003) I can see where your issues lie:




                The role pretty much means being in charge of scheduling the necessary ceremonies,




                Nope, the team/PO own the ceremonies so are responsible for scheduling them




                being default facilitator for the meetings,




                Nope, you can facilitate to help, but they should be able to function without you.




                and making sure the team upholds the promises they said they would do




                Nope, the team makes a forecast of what they will do (commitment was deprecated in 2011 as it's fixed scope in fixed time)



                You are in a very common Scrum antipattern - Scrum Mom ( see here - https://age-of-product.com/scrum-mom/)



                As a Scrum Master your role is:




                • Help the team clear blockers

                • Coach the team on the agreed process.


                You have no responsibilities over whether the team deliver, you are there to help work flow, it's a people job, not involving project management or administration.



                Your stress is because you are being asked to do things that are deliberately NOT in the Scrum Master remit.






                share|improve this answer


























                  1












                  1








                  1






                  As a professional agile coach (and someone who has been in the agile space since 2003) I can see where your issues lie:




                  The role pretty much means being in charge of scheduling the necessary ceremonies,




                  Nope, the team/PO own the ceremonies so are responsible for scheduling them




                  being default facilitator for the meetings,




                  Nope, you can facilitate to help, but they should be able to function without you.




                  and making sure the team upholds the promises they said they would do




                  Nope, the team makes a forecast of what they will do (commitment was deprecated in 2011 as it's fixed scope in fixed time)



                  You are in a very common Scrum antipattern - Scrum Mom ( see here - https://age-of-product.com/scrum-mom/)



                  As a Scrum Master your role is:




                  • Help the team clear blockers

                  • Coach the team on the agreed process.


                  You have no responsibilities over whether the team deliver, you are there to help work flow, it's a people job, not involving project management or administration.



                  Your stress is because you are being asked to do things that are deliberately NOT in the Scrum Master remit.






                  share|improve this answer














                  As a professional agile coach (and someone who has been in the agile space since 2003) I can see where your issues lie:




                  The role pretty much means being in charge of scheduling the necessary ceremonies,




                  Nope, the team/PO own the ceremonies so are responsible for scheduling them




                  being default facilitator for the meetings,




                  Nope, you can facilitate to help, but they should be able to function without you.




                  and making sure the team upholds the promises they said they would do




                  Nope, the team makes a forecast of what they will do (commitment was deprecated in 2011 as it's fixed scope in fixed time)



                  You are in a very common Scrum antipattern - Scrum Mom ( see here - https://age-of-product.com/scrum-mom/)



                  As a Scrum Master your role is:




                  • Help the team clear blockers

                  • Coach the team on the agreed process.


                  You have no responsibilities over whether the team deliver, you are there to help work flow, it's a people job, not involving project management or administration.



                  Your stress is because you are being asked to do things that are deliberately NOT in the Scrum Master remit.







                  share|improve this answer














                  share|improve this answer



                  share|improve this answer








                  edited 9 hours ago

























                  answered 12 hours ago









                  The Wandering Dev Manager

                  31.1k1060110




                  31.1k1060110






























                      draft saved

                      draft discarded




















































                      Thanks for contributing an answer to The Workplace Stack Exchange!


                      • Please be sure to answer the question. Provide details and share your research!

                      But avoid



                      • Asking for help, clarification, or responding to other answers.

                      • Making statements based on opinion; back them up with references or personal experience.


                      To learn more, see our tips on writing great answers.





                      Some of your past answers have not been well-received, and you're in danger of being blocked from answering.


                      Please pay close attention to the following guidance:


                      • Please be sure to answer the question. Provide details and share your research!

                      But avoid



                      • Asking for help, clarification, or responding to other answers.

                      • Making statements based on opinion; back them up with references or personal experience.


                      To learn more, see our tips on writing great answers.




                      draft saved


                      draft discarded














                      StackExchange.ready(
                      function () {
                      StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fworkplace.stackexchange.com%2fquestions%2f125575%2fadditional-role-at-work-highly-stressful-keep-for-growth-or-drop-for-not-a-go%23new-answer', 'question_page');
                      }
                      );

                      Post as a guest















                      Required, but never shown





















































                      Required, but never shown














                      Required, but never shown












                      Required, but never shown







                      Required, but never shown

































                      Required, but never shown














                      Required, but never shown












                      Required, but never shown







                      Required, but never shown











                      Popular posts from this blog

                      Understanding the information contained in the Deep Space Network XML data?

                      Ross-on-Wye

                      Eastern Orthodox Church